Operations Management Archive: Questions from May 09, 2022
-
Question Completion Status 5 points QUESTION 1 Problem Duration (Months) Costs (S000's) Penalty per month Activity Predecessor Normal Minimum Normal crashed aanom 4 6 8 5 6 4 4 5 2 4 3 4 7 4 4 3 2 4 53 answers -
Problem Duration (Months) Costs (sooo's) Penalty per month Normal crashed Activity Predecessor Normal Minimum < A 4 3 2,000 3,000 B 6 4 3,000 5,000 с 8 7 1,000 2,000 D 5 4 4,000 6,000 E 6 4 2,000 3,01 answer -
Problem 25 2. 2 un 21 12 10 18 30 9 0 10 12 17 15 25 3 3 6 The diagram above shows a network of shipments that are sent from location 1 to location 7 The number on each arc is the capacity of shipme1 answer -
Consider the following schematic of an integer problem with a binary restriction. The objective function for this problem is to maximize z. Considera el siguiente esquemático de un problema entero co1 answer -
The following is a partition of an integer programming problem with a binary restriction. Lo siguiente es una partición de un problema de programación entero con restricción binaria. Maximize Z= 261 answer -
Problem Duration (Months) Costs ($000's) Penalty per month Normal crashed Activity Predecessor Normal Minimum IN A B с D E F G H 1 Au00 4 6 8 5 6 3 4 7 4 4 2,000 3,000 1,000 4,000 2,000 2,500 3,000 51 answer -
Problem 25 2 5 21 12 10 18 30 9 12 10 17 15 25 3 6 The diagram above shows distances in kilometers from location 1 to 7. Use the shortest route method to complete the following table with partial an1 answer -
how many units of the fourth constraint resource are used
Se proporciona la solución óptima del siguiente modelo de programación lineal: MAX Z = X1 + 3X2 ST -4X1 + 5X2 = 6 2X1 + 3X2 > 11 X1, X2 > 0 LP OPTIMUM FOUND AT STEP 4 OBJECTIVE FUNCTION VALUE 1)1 answer -
0 answers
-
0 answers